For those with ADA-Recognized Disabilities,
Remote Participation is available for
Open Meetings (Council Meetings/Planning and zoning, etc.).
Please submit
Application for Remote Access to Public Meetings
See Resolution in link below.
***
City of Walker Parks & Rec
Community Outreach page
For those paying online that may be on disconnect
list or making a payment later than due date,
please notify the Utility Department to be
sure your payment is processed to avoid delay
in restoring service or avoid
disruption of service.
OTHER ONLINE PAYMENTS:
ALCOHOL LICENSE*ANIMAL CONTROL*BUILDING PERMITS
Unified Developement Code (UDC) updated January 2023
City of Walker Master plan updated 2018
Click image for Sexual Harassment Policy
COUNCIL MEETING
Monday, December 9, 2024
6:00 p.m.
(See main page if link doesn't open)
Planning & Zoning Meeting
Monday, December 16, 2024
6:00 p.m.
City Hall
13600 Aydell Lane
***
CITY OF WALKER JOB APPLICATION new online version
WALKER POLICE DEPARTMENT JOB APPLICATION
*****
The Water We Drink
Consumer Confidence Report 2023
DEQ Water Source Assessment 2022
Consumer Confidence Report 2022
Consumer Confidence Report 2021
Consumer Confidence Report 2020
Consumer Confidence Report 2019
Cross Connection Control - Appendix D (Louisiana State Plumbing Code)
HURRICANE PREPAREDNESS
Permits & Inspections
Walker Municipal Building
10136 Florida Boulevard
Walker, LA 70785
Phone: 225.665.8893
Hours
7 a.m. to 5:30 p.m.
Monday through Thursday
All contractors doing business in the City of Walker must have a City of Walker contractor's license. For instructions on applying for a license, click here. For a license application, click here.
The contractor must supply the completed application for electrical, plumbing and/or mechanical permits up front or as needed during the construction of the home, and must pay the applicable fees.
For an electrical permit application form, click here.
For a plumbing permit application form, click here.
For a mechanical permit application form, click here.
Your plans will be reviewed for code compliance. For a list of applicable construction codes and editions, click here.
1. Electrical, plumbing and mechanical permits are required on all jobs before rough-in begins.
2. Electrical, plumbing and mechanical permits will be done the same day or the next business working day.
3. No inspections will be done without a permit.
4. Each trade is required to call in their inspections only.
1. Temporary electric pole
2. Rough-in plumbing
3. Foundation
4. Electrical rough in
5. Mechanical rough in
6. Plumping top out/gas
7. Rough framing
8. Electrical final
9. Plumbing final
10. Mechanical final
11. Sewer tie-in
12. Final framing building [require top-of-floor elevation certificate; issue occupancy certificate]